Product Details
Place of Origin: Qingdao
Brand Name: Xinmeiteng
Certification: CE
Model Number: C518
Payment & Shipping Terms
Minimum Order Quantity: 1
Price: Inquiry
Packaging Details: TO BE DETERMINED
Delivery Time: 45 working days after downpayment
Payment Terms: L/C,T/T
Supply Ability: 3 sets per season
Hole Diameter: |
50-80 Mm |
Bore Hole Length: |
500-2300 Mm |
Sponge Diameter: |
1200-1500 Mm |
Motor Power: |
3.7 KW |
Machine Weight: |
2000 Kg |
Overall Dimension: |
6500×2000×2500 Mm |
Hole Diameter: |
50-80 Mm |
Bore Hole Length: |
500-2300 Mm |
Sponge Diameter: |
1200-1500 Mm |
Motor Power: |
3.7 KW |
Machine Weight: |
2000 Kg |
Overall Dimension: |
6500×2000×2500 Mm |
Cylinder Foam Boring Machine with 3.7 kW Motor Power and 50-80 mm Hole Diameter for 500-2300 mm Bore Hole Length
The C518 is the boring and bar-threading station that sits between a vertical cylinder foaming machine and a foam peeling or skiving machine. It drills a centered hole through a cylindrical PU foam block and feeds the hanging bar through that hole in the same clamped cycle, so the block reaches the peeling machine ready to rotate. The standard configuration accepts blocks of 1200–1500 mm diameter, bores 50–80 mm holes over a 500–2300 mm length, and runs on a 3.7 kW motor. The machine weighs 2000 kg and occupies 6500×2000×2500 mm.
This page approaches the C518 from one specific direction: peel yield. A boring station is often treated as a preparation step, yet the position of the bore decides how evenly the block rotates on the peeling machine, how much foam has to be left as a safety allowance, and how much of each block becomes saleable sheet instead of scrap. The sections below cover bore geometry, clamping, tooling, threading, acceptance checks, cycle planning and maintenance in the order a production engineer would evaluate them.
Automatic center positioning references each block before drilling, which reduces the wall allowance needed to correct an eccentric bore.
The bar is fed along the drill axis while the block is still held in the centered position, so the bore is not scraped during insertion.
Holding force is spread around the cylinder so compressible foam keeps its round section and the bore stays straight through the full length.
The operator sequence is short, but each step has a quality consequence. The cycle below is the standard sequence used during commissioning and operator training.
The critical discipline is simple: never release the block between drilling and threading. Once the clamp opens, the block can shift by a few millimetres, and that is enough to make a straight bore misaligned with the bar.
Peeling removes material from the outside of a rotating block. The minimum radius the blade can reach is set by the bar axis plus the wall that must remain around the bore. If the bore is off center by an amount e, the wall on the thin side is reduced by e, and the operator has to end the peel earlier on that side to avoid cutting into the bore. The foam left on the thick side becomes scrap.
The relationship is easy to state: for a block of diameter D and a bore of diameter d, the nominal wall is (D − d) / 2. An eccentricity e makes the minimum wall (D − d) / 2 − e. Every millimetre of eccentricity either becomes lost sheet or forces a thicker safety allowance around the whole block. On a 1200–1500 mm block, that allowance is paid on every block, all shift.
| Bore condition | Effect on peeling | Practical response |
|---|---|---|
| Centered, straight bore | Uniform wall, steady rotation, consistent sheet thickness | Run the normal peel allowance and standard feed |
| Bore offset to one side | Thin wall on one side, early halt, foam left on the other side | Check center positioning and clamp seating before the next block |
| Bore curved along the length | Block runs out of balance, peel thickness waves | Check drill feed, clamp pressure and block support |
| Bore enlarged or torn at entry | Bar fits loosely, block can shift during peeling | Check drill sharpness and entry feed |
| Bore oval instead of round | Bar contact is uneven, rotation is not smooth | Check three-direction clamp force and pad condition |
The point of the table is diagnostic. Each bore defect points to a different cause, and the cause is usually in the clamping, the tooling or the feed, not in the foam itself.
Foam is compressible, and that is the whole difficulty of boring it. A two-point clamp lets the block flatten slightly under drilling thrust; the section goes oval, the drill follows the softer path and the bore drifts. Three-direction clamping spreads the force around the circumference, so the block stays round and the drill sees a more uniform resistance.
Center positioning then removes the operator judgement from the setup. Instead of marking a center by eye, the machine references the block and positions the drill axis against the geometric center before penetration. This matters when blocks come from different foaming cycles: diameter and roundness vary slightly, and a fixed position that suits one block is slightly off for the next.
Two operating habits protect the result. First, clean the clamp pads at the end of each shift; foam dust builds up unevenly and changes the effective clamping diameter. Second, confirm the block is fully seated before the clamp closes. A block resting on a chip or a scrap of foam is clamped off center, and no amount of center positioning can correct a block that is not sitting square on the support.
The drill is the only part of the machine that touches the bore wall, so its condition sets the surface quality. A sharp drill with clean flutes cuts foam; a dull or loaded drill rubs, heats and tears. For the 50–80 mm hole range, the drill should be matched to the bar diameter and to the foam grade, and it should be inspected at the start of each shift rather than replaced only when the bore looks poor.
Chip removal is a housekeeping issue as much as a tooling issue. Foam chips accumulate around the clamp and the center-positioning components, and a build-up changes how the next block seats. Cleaning at the end of each shift is faster than diagnosing a bore problem caused by a chip under the clamp.
On a conventional line, the bar is pushed through the bore by two operators with a guide, after the block has been released from the drill and often re-clamped. That sequence is slow, it exposes operators to a heavy bar, and it introduces the misalignment that spoils an otherwise good bore.
The C518 feeds the bar while the block is still clamped in the centered position, along the same axis as the drill. The practical results are:
Bar condition still matters. A bent bar will not follow a straight bore, and forcing it damages the bore wall. Check the bar for straightness before loading, and keep the bar feed guide clean and aligned.
Layout matters more than it appears. The C518 is 6500 mm long, and the block has to be brought in, aligned and taken out with a crane, hoist or roller conveyor. Leave clear access at both ends and keep the operator station clear of stacked material. If the discharge height is set to match the peeling machine infeed during layout, the block can be transferred without lifting it twice.
The station is not a substitute for a horizontal boring machine used on rectangular block foam. Cylinder blocks and block bales follow different routes, and re-clamping a round block on equipment designed for rectangular bales loses the centering advantage that the C518 is built around.
| Parameter | Value |
|---|---|
| Model | C518 |
| Hole diameter | 50–80 mm |
| Bore hole length | 500–2300 mm |
| Sponge diameter | 1200–1500 mm |
| Motor power | 3.7 kW |
| Machine weight | 2000 kg |
| Overall dimension (L×W×H) | 6500×2000×2500 mm |
| Certification | CE |
The four working figures — hole diameter, bore length, sponge diameter and motor power — define what the standard C518 accepts. Blocks outside these ranges need a different configuration and should be checked against the actual block size before ordering.
Bore quality starts with the block that arrives at the station. Three incoming checks prevent the majority of bore problems before the drill moves:
After drilling, the acceptance check is a trial measurement rather than a visual judgement. Measure the bore position, the bore diameter and the wall thickness at several points along the length. A block that passes is released to the peeling machine; a block that fails is quarantined and the machine settings are checked before the next block.
Boring is a single-station operation, so its output is set by cycle time, not by motor power. The cycle is the sum of loading, clamping, center positioning, drilling, retracting, threading and unloading. Throughput in blocks per hour is 3600 divided by that cycle in seconds.
Two levers usually matter more than drill speed:
Balance the line around the peeling machine, not around the drill. The peeling machine is usually the capacity constraint, and the boring station only needs enough output to keep it fed. Pushing the drill faster while the peeling machine waits adds wear without adding saleable sheet.
The standard C518 covers 1200–1500 mm blocks, 500–2300 mm bore lengths and 50–80 mm holes. Within that envelope, a changeover touches four settings:
Run one trial block after every changeover and measure it before releasing the batch. The trial block is the lowest-cost quality gate in the plant.
The C518 is used wherever cylindrical PU foam is peeled into continuous sheet or prepared for a bar-based handling system.
Installation starts with a level, load-bearing floor. The machine weighs 2000 kg, and the clamping forces must not be allowed to walk the frame over time, so the frame is leveled, anchored and checked for twist before any block is loaded.
The single key commissioning step is the alignment between the drill axis and the bar feed axis. If the two are offset, the bore can be straight and still misaligned with the bar, and the problem only shows up as a tight or scraped bore during threading. After alignment, run a trial block: verify center positioning, drill the bore, thread the bar and measure the wall thickness around the bore.
The 3.7 kW motor needs a dedicated supply with correct earthing and a local isolator within reach of the operator. Any pneumatic or hydraulic functions used for clamping and bar feeding need a clean, dry air supply; moisture and oil carry-over are a common cause of erratic clamping. Confirm the final utility requirements against the machine diagrams before installation.
The station combines a rotating drill, a heavy bar and a clamping system that holds a compressible block. Guards cover the drill and the clamp area, and the halt circuit must be reachable from the operator position.
Operator training should cover three habits: seated block, clear bar path, and an immediate halt when the sound changes. These three habits prevent the majority of bore defects and near-misses at the station.