Product Details
Place of Origin: Qingdao
Brand Name: Xinmeiteng
Certification: CE
Model Number: TDP-52
Payment & Shipping Terms
Minimum Order Quantity: 1
Price: Inquiry
Packaging Details: TO BE DETERMINED
Delivery Time: 45 working days after downpayment
Payment Terms: L/C,T/T
Supply Ability: 3 sets per season
Boring Diameter: |
45-80 Mm |
Boring Length: |
Max 2300 Mm |
Main Shaft Speed: |
230 R/min |
Positioning Accuracy: |
±0.05 Mm |
Motor Power: |
1.5 KW |
Machine Weight: |
800 Kg |
Boring Diameter: |
45-80 Mm |
Boring Length: |
Max 2300 Mm |
Main Shaft Speed: |
230 R/min |
Positioning Accuracy: |
±0.05 Mm |
Motor Power: |
1.5 KW |
Machine Weight: |
800 Kg |
Horizontal Long-Stroke Foam Boring Machine 2300 mm Boring Length 45-80 mm Boring Diameter for Cylinder Peeling Lines
The TDP-52 is a horizontal boring machine that drills a centered hole through cylindrical PU foam before the block moves to a peeling machine. It uses a 230 r/min spindle, a 1.5 kW motor and a drill range of 45–80 mm, with a maximum boring length of 2300 mm. The frame measures 6000×1500×1800 mm and weighs 800 kg, keeping the station compact enough to fit between a foaming line and a peeler without rebuilding the plant layout.
This page focuses on the part of the job that is easy to underestimate: keeping a 2300 mm bore straight. A horizontal drill with a long overhang behaves differently from a short drilling station. The drill can wander, chips can pack in the flutes, and a block that is not supported at the right height will produce a hole that is straight at the entry and off center at the exit. The sections below cover drill guidance, feed, chip clearance, block support, bore measurement, changeover and line alignment, in the order a production engineer would set the machine up.
A long stroke for full-length cylinder blocks, with the drill guided over the full travel rather than overhung from a short carriage.
One station covers the common mandrel and tube sizes. The drill and guide are matched to the bore, and the change is a setup task, not a machine rebuild.
A stable spindle speed for foam, paired with a 1.5 kW motor that keeps the connected load low for a plant running the line for long shifts.
On a short drilling station, the drill is stiff relative to its overhang and the bore follows the spindle. On a 2300 mm stroke, the drill is long, the overhang grows as the carriage advances, and three things start to matter:
These three points are the practical difference between a machine that drills a 500 mm hole well and one that holds a 2300 mm bore. The TDP-52 addresses them with a guided carriage, a horizontal frame that carries the full stroke, and a loading side that lets the operator set the block support before clamping.
The feed is a judgement call on foam, not a fixed number. Start slower than you think the material needs, clear chips often, and increase only while the bore stays clean and the drill sound stays steady.
The drill is the only part that touches the bore wall, so its condition and guidance decide the surface quality. A sharp drill with open flutes cuts; a dull or packed drill rubs, heats and wanders. For the 45–80 mm range, match the drill to the bore and to the foam grade, and inspect it at the start of each shift rather than waiting for a rejected block.
On denser foam and on long bores, peck feeding is the practical control. Advance a short distance, retract to clear the flutes, then advance again. The extra stroke time is small compared with the cost of a bore that has to be scrapped.
Foam chips are light, but they do not flow out of a deep horizontal hole on their own. They compact against the drill land, and once the flutes are full the drill behaves like a friction tool. The symptoms are easy to recognise: the sound changes, the feed resistance rises, the bore wall looks glazed, and the drill starts to drift.
Three habits keep the bore clean:
Clamping holds the block; support sets its height. Both matter on a long block. If the support is low at the far end, the block tilts and the bore rises or falls along the length. If the clamp is too tight, the foam compresses and the bore closes slightly behind the drill.
Set the support height against the spindle axis before loading the first block of a batch, and check it again after a change of block diameter. On a 1200–1500 mm block, a few millimetres of support error is enough to move the exit bore off center. The check takes a minute and saves the block.
A bore that looks centered at the entry can still be off at the exit. The acceptance check has to look at both ends and at the wall between them.
Record the result for the first block of each batch and after every changeover. If the exit position drifts, check support height and drill condition before changing the feed.
| Parameter | Value |
|---|---|
| Model | TDP-52 |
| Boring diameter | 45–80 mm |
| Boring length | Max 2300 mm |
| Main shaft speed | 230 r/min |
| Positioning accuracy | ±0.05 mm |
| Motor power | 1.5 kW |
| Machine weight | 800 kg |
| Overall dimension (L×W×H) | 6000×1500×1800 mm |
| Certification | CE |
Boring diameter, maximum boring length and spindle speed define what the standard TDP-52 accepts. Blocks longer than 2300 mm, or bores outside 45–80 mm, need a different configuration and should be checked before ordering.
Changing bore size is a setup task with four checkpoints:
Keep the changeover parts in a marked set. A missing guide is usually replaced with whatever is on the shelf, and that is how a good machine starts producing off-center bores.
The practical layout question is the transfer height. If the TDP-52 discharge and the peeler infeed are at the same height, the block moves with one transfer. If they are not, the block has to be lifted and re-centered, and the centering work done at the drill is partly lost. Set the height during layout, not on the first production day.
Boring is a single-station operation, so output is set by cycle time. The cycle is loading, alignment, clamping, drilling, retraction and unloading. Blocks per hour is 3600 divided by that cycle in seconds.
On a long bore, the drilling portion is usually not the bottleneck; the handling and the chip-clearing retracts are. Two levers matter:
Plan capacity around the peeler, which is normally the constraint. The TDP-52 only needs to keep it fed; pushing the drill harder adds wear without adding saleable sheet.
An 800 kg machine still needs a level, load-bearing floor. Leveling matters more than the weight suggests, because the frame carries the full stroke and any twist shows up as a bore that changes height along the block.
The TDP-52 is used where a cylindrical foam block needs a center hole before peeling, or where a finished foam tube needs a clean bore.
Installation starts with the floor and the frame. Level the frame, check for twist, anchor it, then align the spindle axis with the block support. After mechanical alignment, run an empty stroke to confirm the carriage travel and the drill path before loading foam.
Commissioning then moves to a trial block: set the support, clamp, drill a full-length bore and measure entry, exit and wall thickness. That trial sets the baseline for the batch. Operator training covers block seating, support height, feed and chip clearing, and the halt procedure for a jammed drill.
The station has a rotating drill, a moving carriage and a clamped foam block. Guards cover the drill and carriage path, and the halt circuit must be reachable from the operator position.
Operator training should focus on three habits: seated block, correct support height, and an immediate halt when the sound changes. These prevent the majority of bore defects and jammed drills.