Product Details
Place of Origin: Qingdao
Brand Name: Xinmeiteng
Certification: CE
Model Number: TDP-10
Payment & Shipping Terms
Minimum Order Quantity: 1 Set
Price: Inquiry
Packaging Details: TO BE DETERMINED
Delivery Time: 45 working days after downpayment
Payment Terms: L/C,T/T
Supply Ability: 3 sets per season
Motor Power: |
33 KW |
Stirring Volume: |
15 M³ |
Stirring Rate: |
40 R/min |
Machine Weight: |
8000 Kg |
Productive Capacity: |
3 Blocks/h |
Foaming Size: |
2100*1800*1000 Mm |
Motor Power: |
33 KW |
Stirring Volume: |
15 M³ |
Stirring Rate: |
40 R/min |
Machine Weight: |
8000 Kg |
Productive Capacity: |
3 Blocks/h |
Foaming Size: |
2100*1800*1000 Mm |
The TDP-10 is a rebonded foam making line that turns shredded waste foam into blocks of 2100*1800*1000 mm at 3 blocks per hour. The whole line runs on a 33 kW motor, the machine weighs 8000 kg, the stirring tank takes a 15 m³ batch at 40 r/min, and the line footprint is 4000*4000*5400 mm. It is CE certified.
Power is where a foaming line keeps costing money after the purchase. A line that needs a large installed load pays for it every shift, in cable size, transformer capacity and electricity. The TDP-10 is built around a 33 kW drive, so the line can be installed in a workshop without a substation upgrade, and the running cost per block stays predictable.
The whole line runs on one 33 kW drive, so no substation upgrade is needed for installation.
Compact enough for an existing workshop bay, heavy enough to hold alignment under mixing load.
Output is set by the cycle, not by a bigger motor, so energy per block stays flat.
Three blocks per hour comes from the cycle, not from the motor size. Keeping the mould staged and the mix on time is what actually delivers the output figure.
The number that matters on a foaming line is energy per finished block. A 33 kW drive running a steady three-block cycle uses a calculable amount of power per block; a larger drive on the same cycle does not make blocks faster, it just draws more. That is why the TDP-10 is specified around the cycle rather than around a bigger motor.
Installed power also decides where the line can go. A 33 kW line can be connected in a workshop that would need a substation upgrade for a 75 kW line. For a plant adding recycling capacity in an existing bay, that difference is often the deciding factor between a project that starts this quarter and one that waits for an electrical upgrade.
Running cost is not only electricity. A smaller drive means smaller cable, smaller switchgear and a simpler panel, all of which reduce maintenance and spare-part stock. The trade is that the line must be run on its cycle: if the mould staging slips, output drops and the cost per block rises.
| Parameter | Value |
|---|---|
| Model | TDP-10 |
| Foaming size | 2100*1800*1000 mm |
| Stirring volume | 15 m³ |
| Stirring rate | 40 r/min |
| Productive capacity | 3 blocks/h |
| Motor power | 33 kW |
| Machine weight | 8000 kg |
| Overall dimension | 4000*4000*5400 mm |
| Certification | CE |
| Symptom | Likely cause | Action |
|---|---|---|
| Block density uneven | Mixing time too short or binder dosing uneven | Extend the mixing cycle, check the dosing pump and spray pattern |
| Block collapses after demould | Binder ratio too low for the shredded foam | Check the binder ratio and give the block its full cure time |
| Foam not bonding in the core | Shredded foam too coarse or binder coverage poor | Reduce shred size, check spray coverage across the tank |
| Block sticks in the mould | Release agent missed or worn off | Re-apply release agent and check the mould surface |
| Output below 3 blocks per hour | Cure time or mould staging delay | Stage moulds so filling does not wait for demoulding |
| Drive trips under load | Mould over-filled or drive fault | Cut the fill weight, check motor current against the 33 kW rating |
Foaming faults show up after demoulding, when the block is already made. Check the mix and the binder dosing before the fill, and one wasted batch is avoided.
The line occupies 4000*4000*5400 mm, so plan the shredder feed, the binder storage and the block staging around it. The most common layout mistake is leaving no room for cured blocks, which forces the operator to stop the line while a block is moved.
Binder handling is the safety topic on a foaming line. Keep the dosing area ventilated, keep the binder containers closed, and make sure the operator knows the cure time before demoulding.
The mixing tank and the dosing pump carry the quality. Check the spray pattern and the dosing calibration at the start of each shift, and clean the tank before binder build-up changes the batch. A dosing pump that is slightly off shows up as a density variation across the block, not as an obvious fault.
The mould station is the mechanical wear point. Check the release agent, the mould surface and the sealing, and keep the demoulding mechanism lubricated. A mould that starts sticking will damage block corners before it fails outright.
The line ships in export packing with the mixing tank, mould station and control panel separated and braced. At 8000 kg and 4000*4000*5400 mm working footprint, plan the container loading and the receiving access before the shipment date.
Delivery is 45 working days after downpayment, payment by T/T or L/C, minimum order one set. Installation guidance, remote commissioning support and spare dosing parts can ship with the line.
A: 33 kW for the whole line, which keeps the electrical installation within a normal workshop supply.
A: 3 blocks per hour with a 2100*1800*1000 mm mould, set by the cycle time.
A: A 15 m³ batch in the mixing tank, stirred at 40 r/min.
A: 8000 kg, 4000*4000*5400 mm overall.
A: 45 working days after downpayment, T/T or L/C, minimum order one set.
Tell us the foam type, block or roll size, target sheet thickness and expected output per shift. We will confirm the machine configuration, quote it and share the delivery schedule. Spare blades, guide parts and remote commissioning support are available with every order.