Product Details
Place of Origin: Qingdao
Brand Name: Xinmeiteng
Certification: CE
Model Number: C619
Payment & Shipping Terms
Minimum Order Quantity: 1 Set
Price: Inquiry
Packaging Details: TO BE DETERMINED
Delivery Time: 45 working days after downpayment
Payment Terms: L/C,T/T
Supply Ability: 3 sets per season
Machine Weight: |
15 T |
Motor Power: |
33.5 KW |
Mixing Tank Volume: |
15 M³ |
Production Capacity: |
4 Blocks/h |
Density Range: |
≤120 Kg/m³ |
Density Tolerance: |
±5 Kg/m³ |
Machine Weight: |
15 T |
Motor Power: |
33.5 KW |
Mixing Tank Volume: |
15 M³ |
Production Capacity: |
4 Blocks/h |
Density Range: |
≤120 Kg/m³ |
Density Tolerance: |
±5 Kg/m³ |
The C619 is a 15 t rebond block foaming machine with a 33.5 kW mixing drive and a 15 m³ mixing tank. Output is 4 blocks per hour, density is held within ±5 kg/m³ up to 120 kg/m³, the foaming tank is supplied in two customized dimensions and the machine is CE certified.
A rebond line runs three shifts with a binder that never fully stops curing. The load on the frame is constant, and the parts that fail first on a light machine are the ones that decide density: the mixer mounting, the tank structure and the mould station alignment.
Constant load from three-shift running without the mixer mounting drifting.
Mixing speed held through a full 15 m³ batch.
Batch volume that keeps a 4 blocks/h line fed.
Re-torque the mounting bolts after the first week of running. A heavy frame settles into its foundation, and the first week is when a loose bolt turns into a density problem.
A rebond mixer works against a dense, heavy mass of granule and binder. At 15 m³ a batch is not a light load, and the drive has to move that mass every cycle. The reaction goes into the frame, the mixer mounting and the tank structure.
On a light frame the mounting moves by fractions of a millimetre over months. That movement changes the mixing pattern, the binder distribution changes with it, and the block density starts to vary in a way that is hard to trace back to the machine.
The 15 t frame is the reason the machine can hold ±5 kg/m³ across three shifts. It is not a marketing number: it is what keeps the geometry of the mixing and foaming stages constant while the line runs.
| Parameter | Value |
|---|---|
| Model | C619 |
| Mixing tank volume | 15 m³ |
| Foaming tank dimension | Customized, two options |
| Production capacity | 4 blocks/h |
| Density range | ≤120 kg/m³ |
| Density tolerance | ±5 kg/m³ |
| Motor power | 33.5 kW |
| Machine weight | 15 t |
| Certification | CE |
| Symptom | Likely cause | Action |
|---|---|---|
| Block density varies from top to bottom | Mixing time too short or binder unevenly distributed | Extend mixing time and check binder dosing |
| Block cracks while curing | Steam or cure time too short for the density | Increase cure time and check steam pressure |
| Density above the target | Weighing error on granule or binder | Calibrate the scale and re-check the batch recipe |
| Output drops below 4 blocks/h | Tank changeover or mould handling is slow | Plan the mould sequence and shorten changeover |
| Block rebounds poorly | Binder ratio low for the granule size | Raise the binder ratio and test a block |
| Discharge blocked | Granule build-up in the tank outlet | Clean the outlet and check granule moisture |
Rebond density problems are almost always dosing or mixing time. Weigh the granule and the binder, mix long enough for the batch size, and check one block from each shift rather than one block per week.
Plan the installation with lifting equipment rated for the individual assemblies, not the total weight. The tanks and the frame are moved separately and each has its own lifting points.
During running, keep clear of the mould station and the tank outlets. Binder and hot block handling are the two places where a heavy line becomes a safety issue rather than a production one.
On a 15 t machine the frame itself needs almost nothing, which is the point. The maintenance that matters is on the mounting bolts, the mixer drive coupling and the tank outlets.
Check the coupling and the mounting monthly, and the bolts again after any change in batch size. A line that moves from 80 kg/m³ to 120 kg/m³ orders is running a heavier batch, and the frame sees it.
The line ships in export packing in major assemblies. At 15 t, confirm the crane or forklift capacity at both ends, the container loading sequence and the floor loading at the destination before shipment.
Delivery is 45 working days after downpayment, payment by T/T or L/C, minimum order one set. Installation guidance and commissioning support ship with the machine.
A: 15 t, on a frame built for continuous three-shift running.
A: 33.5 kW, holding speed through a full 15 m³ batch.
A: up to 120 kg/m³ held within ±5 kg/m³.
A: a level, load-rated floor; re-torque the mounting bolts after the first week.
A: 45 working days after downpayment, T/T or L/C, minimum order one set.
Tell us the foam type, block or roll size, target sheet thickness and expected output per shift. We will confirm the machine configuration, quote it and share the delivery schedule. Spare blades, guide parts and remote commissioning support are available with every order.