Product Details
Place of Origin: Qingdao
Brand Name: Xinmeiteng
Certification: CE
Model Number: TDP-1500
Payment & Shipping Terms
Minimum Order Quantity: 1 Set
Price: Inquiry
Packaging Details: TO BE DETERMINED
Delivery Time: 45 working days after downpayment
Payment Terms: L/C,T/T
Supply Ability: 3 sets per season
Rotation Speed: |
3000-5000 Rpm |
Overall Dimension: |
4000*6000*8500 Mm |
Foaming Density: |
8-50 Kg/m³ |
Production Capacity: |
3000 Kg/h |
Machine Weight: |
12000 Kg |
Total Power: |
56 KW |
Rotation Speed: |
3000-5000 Rpm |
Overall Dimension: |
4000*6000*8500 Mm |
Foaming Density: |
8-50 Kg/m³ |
Production Capacity: |
3000 Kg/h |
Machine Weight: |
12000 Kg |
Total Power: |
56 KW |
The TDP-1500 is a vertical cylinder continuous foaming machine. Foaming diameter is 1.2-1.5 m, production capacity is 3000 kg/h, foaming flow is 90 L/min, density range is 8-50 kg/m³, total power is 56 kW and machine weight is 12000 kg. The machine is CE certified.
Capacity is where a foaming line is won or lost. A line that pours 2000 kg/h cannot keep a peeler and two slicers busy, so the peelers wait and the labour cost per sheet climbs. The TDP-1500 is set at 3000 kg/h with a 90 L/min flow, which is the point where one pouring station feeds a full mattress foam line without a second shift.
Output is not only the pump size. The lifting table has to rise at a rate that matches the pour, the rotation speed has to hold the block round, and the trough and fall plate have to stay at temperature through a long run. On the TDP-1500 the lift speed and rotation are set from the PLC panel, so the 3000 kg/h figure repeats block after block instead of drifting with the operator.
One pouring station covers the hourly demand of a mid-size mattress foam line.
Flow is matched to the lift speed so the block density stays even top to bottom.
Cylinder blocks peel with less waste per ton of finished sheet.
Metering pumps, mixing head, lift and rotation run from one supply.
Weigh the first block of every recipe against the density target. A 5% weight drift is easier to correct at the panel than at the peeler.
A line running at 2000 kg/h leaves the peeler idle between blocks. The operator uses that gap to handle the block, which is exactly the labour the machine was bought to remove. At 3000 kg/h the pour outruns block handling, so the peeler stays loaded and the sheet cost drops with the same crew.
The second gain is scheduling. With 3000 kg/h, a customer order that used to need two production days fits into one, and small runs can be grouped without changing the recipe. That is what makes a cylinder foaming line viable for mixed orders rather than one standard density.
The third gain is waste. A 1.2-1.5 m cylinder block peels into sheets with a predictable core loss. The bigger the block against the same sheet size, the lower that loss spreads across the tonnage, and the 3000 kg/h output is what makes the bigger block worth pouring.
| Parameter | Value |
|---|---|
| Model | TDP-1500 |
| Machine type | Vertical cylinder continuous foaming machine |
| Foaming diameter | ⌀1.2-1.5 m |
| Foaming density | 8-50 kg/m³ |
| Foaming flow | 90 L/min |
| Production capacity | 3000 kg/h |
| Rotation speed | 3000-5000 rpm |
| Lifting speed | 0-3 m/min |
| Total power | 56 kW |
| Machine weight | 12000 kg |
| Overall dimension | 4000*6000*8500 mm |
| Certification | CE |
| Symptom | Likely cause | Action |
|---|---|---|
| Block density varies top to bottom | Lift speed out of step with the pour rate | Reset the lift speed to match the 90 L/min flow |
| Foam sags or collapses in the centre | Catalyst ratio or foam temperature off spec | Check the metering recipe and the component temperature |
| Block diameter out of tolerance | Rotation speed drifting during the pour | Re-check the rotation setting and the drive belt |
| Surface skin blisters | Trough or fall plate temperature too high | Check the heating circuit and the film feed |
The machine travels in an export-grade wooden case with the electrics protected and the cutter or blade assembly braced separately. Machine weight is 12000 kg and the overall dimension is 4000*6000*8500 mm, so the unit is quoted against a 20ft or 40ft container depending on the line it ships with.
A packing list, wiring diagram, operation manual and CE declaration travel with every unit. Delivery is 45 working days after downpayment; installation and commissioning support is available remotely or on site.
A: 3000 kg/h at a 90 L/min foaming flow, with the lift speed set to match the pour.
A: 1.2-1.5 m cylinder blocks; the diameter is set by the trough and the rotation speed.
A: A cylinder boring machine for the centre hole and a horizontal peeler or slicer convert the poured blocks into foam sheets.
A: Flexible polyurethane foam from 8 kg/m³ to 50 kg/m³, set through the metering pump recipe.
Tell us the foam type, density, block diameter and the hourly output you need. We will confirm the TDP-1500 configuration, quote the line and share the delivery schedule. Mixing heads, spare metering pumps and remote commissioning support are available with every order.