Product Details
Place of Origin: Qingdao
Brand Name: Xinmeiteng
Certification: CE
Model Number: TDP-1500
Payment & Shipping Terms
Minimum Order Quantity: 1 Set
Price: Inquiry
Packaging Details: TO BE DETERMINED
Delivery Time: 45 working days after downpayment
Payment Terms: L/C,T/T
Supply Ability: 3 sets per season
Foaming Density: |
8-50 Kg/m³ |
Overall Dimension: |
4000*6000*8500 Mm |
Production Capacity: |
3000 Kg/h |
Foaming Diameter: |
⌀1.2-1.5 M |
Foaming Flow: |
90 L/min |
Total Power: |
56 KW |
Foaming Density: |
8-50 Kg/m³ |
Overall Dimension: |
4000*6000*8500 Mm |
Production Capacity: |
3000 Kg/h |
Foaming Diameter: |
⌀1.2-1.5 M |
Foaming Flow: |
90 L/min |
Total Power: |
56 KW |
The TDP-1500 is a vertical cylinder continuous foaming machine with a 90 L/min foaming flow and 56 kW total power. Foaming diameter is 1.2-1.5 m, production capacity is 3000 kg/h, density range is 8-50 kg/m³ and machine weight is 12000 kg. The machine is CE certified.
A foaming machine is bought for the flow it can hold, not the number on the brochure. The 90 L/min figure is what allows the block to be poured at 3000 kg/h without the pour starving at the end of the stroke, and it is the number the chemical pumps, mixing head and trough have to work with.
Power is the other half. Metering pumps, mixing head, lift, rotation and heating all draw from the same 56 kW supply, so the electrical installation is planned once rather than added to later. On a line that runs two or three shifts, that sizing is the difference between a stable pour and a machine that trips the plant supply.
The pour keeps pace with a 3000 kg/h line without starving at the end of the stroke.
Pumps, head, lift, rotation and heating sized from one supply.
Flow and lift speed are set together so the block stays even.
PLC settings carry over to the next block.
Log flow and lift speed for the first block of each shift. Two numbers on a sheet will tell you more about a density complaint than an hour at the peeler.
A pour that loses flow at the end of the stroke leaves the top of the block short of foam. The block looks acceptable from the outside, then peels into sheets that run thin at one end. The 90 L/min working point exists so the flow holds when the chemical lines are at temperature and the head has been running for hours.
The second reason is the mixing head. Below its working flow the head does not mix the two components cleanly, and the block carries streaks that show up as hard spots after peeling. Keeping the flow at the rated point is cheaper than sorting blocks at the peeler.
Power and flow are linked. The 56 kW supply is sized for the rated flow with the pumps, lift, rotation and heating all running, so a stable pour does not depend on switching something else off.
| Parameter | Value |
|---|---|
| Model | TDP-1500 |
| Machine type | Vertical cylinder continuous foaming machine |
| Foaming diameter | ⌀1.2-1.5 m |
| Foaming density | 8-50 kg/m³ |
| Foaming flow | 90 L/min |
| Production capacity | 3000 kg/h |
| Rotation speed | 3000-5000 rpm |
| Lifting speed | 0-3 m/min |
| Total power | 56 kW |
| Machine weight | 12000 kg |
| Overall dimension | 4000*6000*8500 mm |
| Certification | CE |
| Symptom | Likely cause | Action |
|---|---|---|
| Block density varies top to bottom | Lift speed out of step with the pour rate | Reset the lift speed to match the 90 L/min flow |
| Foam sags or collapses in the centre | Catalyst ratio or foam temperature off spec | Check the metering recipe and the component temperature |
| Block diameter out of tolerance | Rotation speed drifting during the pour | Re-check the rotation setting and the drive belt |
| Surface skin blisters | Trough or fall plate temperature too high | Check the heating circuit and the film feed |
The machine travels in an export-grade wooden case with the electrics protected and the cutter or blade assembly braced separately. Machine weight is 12000 kg and the overall dimension is 4000*6000*8500 mm, so the unit is quoted against a 20ft or 40ft container depending on the line it ships with.
A packing list, wiring diagram, operation manual and CE declaration travel with every unit. Delivery is 45 working days after downpayment; installation and commissioning support is available remotely or on site.
A: 90 L/min, matched to the 3000 kg/h output and the lift speed.
A: 56 kW covers the metering pumps, mixing head, lift, rotation and heating circuits.
A: A cylinder boring machine for the centre hole and a horizontal peeler or slicer convert the poured blocks into foam sheets.
A: Flexible polyurethane foam from 8 kg/m³ to 50 kg/m³, set through the metering pump recipe.
Tell us the foam type, density, block diameter and the hourly output you need. We will confirm the TDP-1500 configuration, quote the line and share the delivery schedule. Mixing heads, spare metering pumps and remote commissioning support are available with every order.