Product Details
Place of Origin: Qingdao, China
Brand Name: Xinmeiteng
Certification: CE
Model Number: TDP-2650
Payment & Shipping Terms
Minimum Order Quantity: 1 Set
Price: Inquiry
Packaging Details: TO BE DETERMINED
Delivery Time: 45 working days after down payment
Payment Terms: T/T,L/C
Supply Ability: 3 sets per season
Foam Density Range: |
8-120 Kg/m³ |
Oven Rack Length: |
18 M |
Conveyor Speed: |
2-6.5 M/min |
Side Panel Width: |
930-2300 Mm |
Foaming Height: |
0.4-1250 Mm |
Mixing Motor Power: |
37 KW |
Foam Density Range: |
8-120 Kg/m³ |
Oven Rack Length: |
18 M |
Conveyor Speed: |
2-6.5 M/min |
Side Panel Width: |
930-2300 Mm |
Foaming Height: |
0.4-1250 Mm |
Mixing Motor Power: |
37 KW |
TDP-2650 Horizontal Continuous Foaming Line, 18 m Oven Rack Version
A foaming line is only worth its footprint when the block it makes needs little or no trimming before the saw. This build pairs an 18 m oven rack with a 25 m conveyor and an adjustable panel section, so a block leaves the line close to the size the cutting plan asks for. Capacity sits between 8000 and 15000 kg/h, block width is set anywhere from 930 mm to 2300 mm, and a single 37 kW mixing head covers recipes from 8 kg/m³ soft block to 120 kg/m³ rigid grade. The notes below are written for the plant that has to decide where the line goes, what services it needs and how a recipe gets repeated on the next shift.
Core Advantages
| Advantage | What it means on the floor |
|---|---|
| 18 m rack keeps the block square | Falling plate and side wall carry the block through the rise and the first cure, so shoulders stay true and the saw removes less stock per block. |
| Panel width 930–2300 mm | Furniture block and mattress block come off the same panel section, width set on the drive before the pour and locked for the run. |
| 8–120 kg/m³ window | Soft packaging grade through semi rigid and rigid grade on one head; the recipe changes rather than the hardware. |
| Belt speed 2–6.5 m/min | Speed is chosen against the cure time of the grade, not against a throughput target, so block is never cut early. |
| 8000–15000 kg/h | Output keeps pace with the cutting line behind it and leaves headroom, which takes capacity out of the shift planning argument. |
| One cabinet, one record sheet | Dosing, panel drives, belt and temperature values live on a single panel and are signed off at each shift change. |
Technical Specifications
| Group | Detail |
|---|---|
| Rack and panel | Rack length 18 m; panel travel 930–2300 mm; rise height 0.4–1250 mm |
| Conveyor | Belt length 25 m; belt speed 2–6.5 m/min; cut off station at discharge end |
| Mixing head | 37 kW drive; metered isocyanate, polyol, colour and catalyst lines; head wash cycle |
| Capacity | 8000–15000 kg/h depending on block width, rise height and grade |
| Density window | 8–120 kg/m³ |
| Connected load | 130 kW total |
| Line mass | 30000 kg |
| Footprint | 36000 × 4500 × 3700 mm (L × W × H) |
| Supply | Cabinet built to the voltage confirmed at the order |
| Testing | Pressure test on dosing circuit, insulation test on cabinet, trial block with density read at three points |
Primary Applications
| Industry | Typical Density | Block Use |
|---|---|---|
| Mattress | 25–35 kg/m³ | Cores and overlays for slab lines and covered mattress builds |
| Upholstered furniture | 20–32 kg/m³ | Seat, back and arm block cut to the furniture cutting plan |
| Vehicle interiors | 30–55 kg/m³ | Seat padding and trim grades where density holds the trim tolerance |
| Footwear and apparel | 18–30 kg/m³ | Insole, padding and interlining stock where density sets hand feel |
| Packaging and electronics | 15–25 kg/m³ | Cushion block cut to the thickness the carton is built around |
| Insulation and sealing | 60–120 kg/m³ | Semi rigid and rigid stock for panel, pipe and gasket duty |
Fitting the Line into an Existing Hall
Many plants buy this build to replace a batch station inside a hall that was never laid out for a continuous line, so the layout work starts before the foundation is poured. Three distances decide if the hall works: the clear run in front of the mixing head, the walkway along the panel section, and the forklift route at the discharge end. Get one of them wrong and the line runs, but every block costs an extra move.
Utilities and Services Checklist
| Service | Requirement |
|---|---|
| Foundation | Reinforced strip along the full 36 m run, level across the length, embedded steel channel for the frame sections |
| Power | 130 kW connected load, 37 kW at the head, cable sized for the supply voltage confirmed at order |
| Compressed air | 6 bar dry air at head and panel drives, filter and regulator at the cabinet |
| Water | Wash point at the head with a settling pit and a drain that keeps the floor dry |
| Headroom | 4500 mm above the panel section |
| Access | Forklift route to the discharge end and a 1200 mm operator walkway |
From Recipe Sheet to Repeatable Block
What Drives Cost per Kilogram
Two plants running the same grade on the same line can sit 8 percent apart on cost per kilogram, and the gap rarely comes from the chemical price. It comes from how much of each block is sold as slab. A block that is 4 mm out of height over its length loses that 4 mm on every slice, and on a 1200 mm block that is a visible share of the yield.
None of the four needs new equipment. All four show up in the block height measured at four points along the length, which is why that reading belongs on the shift sheet next to the belt speed.
Hall Temperature and the First Block of a Shift
Foam reacts slower in a cold hall, and the first block of a morning shift is where that shows. A line that ran at 3.2 m/min the previous afternoon may need 2.8 m/min at 7 am in a hall that has cooled overnight, because the block needs longer before it has cured through. Plants that log hall temperature next to belt speed spot the pattern within a week and avoid scrapping the first block. Where the hall is heated, the effect is smaller but not zero: the drum temperature of the polyol matters as much as the air, and a drum that sat cold overnight will change the ratio for the first pour unless it is brought to working temperature first.
Acceptance Test Before You Sign
Documentation and Compliance Pack
Every set ships with foundation and installation drawings, a wiring diagram, the trial block report with the working values, an operation manual in English, a spare parts list with part numbers, and a CE declaration. The drawings are issued before shipment so the foundation can be poured while the line is in transit, and the trial block report is written on the day of commissioning so the plant has a reference for its first month of production.
Spares Policy and Service Response
Warranty runs 12 months from commissioning, with lifetime spare parts support after that. We keep mixing head seal kits, dosing pump diaphragms and temperature probes in stock, and we recommend two seal kits and one diaphragm set on the plant shelf from day one, because those are the parts that decide if a line is down for an hour or for a week. Process questions during start up are handled remotely against the trial block report, and site support can be arranged when a grade needs work on the panel setting.
Shipping and Commercial Terms
The line loads into two 40 ft containers. Head, cabinet and pumps travel in wooden cases; frame sections are bundled by section and wrapped in plastic film. Delivery is about 45 working days after the down payment, with T/T or L/C at sight. Loading photographs and the packing list are issued before the containers leave Qingdao.
Questions From Plant Engineers
Q: How do I know the 18 m rack is worth the extra floor length?
A: Measure the height spread on a block from your current line. If it is more than 5 mm, the saw is removing that difference on every slice, and the rack length is what removes the cause.
Q: Can we run our existing furniture and mattress grades on the same panels?
A: Yes. The panel travel covers 930 to 2300 mm, so both grades fit; what changes between them is the width setting, the rise height target and the belt speed.
Q: What belt speed should we start with?
A: Start at the lower end of the range for the grade, then increase only after the block has cured through at the discharge end. Starting fast is the usual reason a first block is scrapped.
Q: How is density checked on site?
A: Cut a sample at head, middle and tail, weigh each one and compare against the grade band. Three points catch a drift that a single sample at the head would miss.
Q: Do we need a separate foundation block?
A: The frame needs a continuous reinforced strip along its full length, level across the run, with embedded steel channel. A level floor without the strip will not hold alignment on a 36 m frame.
Q: What is the lead time for spare seals?
A: Seal kits and diaphragms are stocked and ship from the parts list without a production slot, usually within a week of the order.
Q: Is the cut off station included?
A: Yes, it comes with the conveyor and follows belt speed, so block length is set from the cutting plan while the line keeps running.
Q: Who writes the trial block report?
A: Our commissioning engineer writes it on site with your operator, and it records head pressure, belt speed, block height and hall temperature for the grades run that day.
Ask for a Layout Review
Send the hall drawing, the grades you pour and the hourly output your cutting line can absorb. We will mark the clearances, the service points and the curing bay on your drawing, then quote the package with the delivery date for your port.